XCITY ENERGY · SAN JUAN, ARGENTINA
Power-secured land.
Compute-ready energy.
Large-scale, power-ready land and integrated infrastructure for AI data centers, renewable developers, and compute-intensive operators. Deploy efficiently, securely, at scale.
100GW
Utility-scale solar target
40B kWh/yr
Projected annual generation
3,000hrs
Peak annual sunshine
240k ha
Compute & green energy zone
Four integrated service modules
Power becomes the entry point, not the end product. Energy, infrastructure, and operations are packaged as one platform.
Power-Secured Land Leasing
Long-term land use and leasing purpose-built for AI data centers and renewable developers, with power access structurally resolved at the outset: defined capacity, secure grid pathways, and scalable expansion options. Infrastructure-grade assets with predictable, long-duration cash flow.
Site Infrastructure Development
Centrally planned site-level infrastructure: access roads and logistics corridors, high-speed communications, and cooling water circulation, delivered to standard at scale. Customer deployment timelines shorten; asset utilization and platform stickiness rise.
EPC Coordination & Delivery
Designated EPC coordination across onboarding, design and permitting, procurement and supply chain, execution management, system integration, grid interconnection, testing, and commissioning. A strategic accelerator from capital expenditure to stable operating cash flow.
Operations & Maintenance
Following commissioning, ongoing operations and maintenance services ensure long-term reliability and performance optimization across the entire asset lifecycle.
The path from zero to 100GW
A phased build-out balancing speed, reliability, and capital efficiency, projected to generate 30-40 billion kWh annually at full scale.
Phase 1
1-3 GW
Demonstration capacity
Validate performance and anchor strategic customers with the first demonstration plants.
Phase 2
10-50 GW
Regional energy clusters
Form regional clusters and establish integrated generation-storage-offtake models.
Phase 3
50-100 GW
Utility-scale system
Accelerate beyond 50 GW to a 100-gigawatt-class system, among the world’s leading clean energy hubs, suitable for asset securitization and power-backed REITs.
Mature photovoltaics + storage · seamless grid integration · long-term predictable cash flows
Watt → Token → Outcome
A three-layer value creation model that turns energy infrastructure into a scalable economic engine.
Watt
Solar generation as a stable long-term asset, predictable cash flow through long-term PPAs.
Token
Electricity becomes compute. High-growth compute and infrastructure services serve global AI demand.
Outcome
The city and freeport ecosystem unlocks valuation upside through trade, finance, and institutional capital.
Turnkey for AI data centers
From secured renewable power to land, cooling, and grid connectivity, operators deploy without navigating fragmented local systems. Faster time-to-market, lower operational uncertainty.
Modular delivery
Power, cooling, land, and regulatory coordination structured as integrated offerings. Clients focus on computing and innovation, not infrastructure management.
Diversified revenue
Energy pricing, infrastructure leasing, and operational services combine for stable baseline income, with upside from the rapid expansion of AI and digital industries.
San Juan, Argentina
One million acres. 3.5× the size of Hong Kong.
San Juan is one of South America’s most strategically positioned regions for next-generation energy: over 2,500 hours of annual sunshine reaching 3,000 in places, vast contiguous plateaus suited to utility-scale solar, and Andean meltwater rivers securing industrial and data-center cooling. National Route 150 links the site to Pacific ports via Chile and Atlantic ports on Argentina’s coast, a natural bi-oceanic corridor serving markets across the Americas, China, Europe, and the Middle East.
- Land
- ~400,000 hectares
- Sunshine
- 2,500-3,000 hrs / year
- Water
- Andean meltwater river systems
- Logistics
- Route 150 bi-oceanic corridor
Deploy where the power already is.
Site selection, power access, EPC, and operations: resolved as one platform. Tell us your capacity requirements and timeline.